Delighted to have finally got under way at this 200m2 liquid overlay for DMA.
We have a lot of preparation to do before the liquid system is installed as well as some internal protection through the immaculate common parts.
Thank you Frank Judge for your assistance in getting this one over the line and also Steve McGregor for the initial introduction.